Basic Engineering
Welcome to Gyp Techno Solution

Basic Engineering

We completed the basic calculation & submit the necessary DPR ( Detaild Project Report ) & many others.

Prepare the documents for selection of equipment like

Construction of materials of equipment

Gear Box and motors make details

Electrical drives and instruments details (standards Make)

Electrical panels specifications

proud_self

Description of equipment how to mentioned in offer

Drawing requirements ( what should be get from supplier)

Documents requirements ( what should be get from supplier)

Process Flow Diagram

Pipe and instrumentation diagram P&I

Equipment Specifications (Together decided after supplier visits)

Equipment & Plant / Site layout & GA drawing

Operating Manual from supplier

Man-power requirement.

Start-up sequence & General Commissioning Procedures

factory

List of plant Emissions ( solids/Liquids/Gaseous/Acoustic)

Structural, building & equipment foundations to be undertaken by 3rd party. We will certify the drawings before release for construction.

List preferred vendor for equipment from ( China & India 3nos min)

List of preferred details EPC Indian contractors 3 nos

List of Detailed Engg Documents which shall be reviewed

All civil design drawings and equipment foundations and structural designs will be prepared by the supplier. We will check, comment & approve to release for construction. (which is related to the equipment)